SEA STEEL TRACK RECORD

Last update Friday, May 23, 2008 14:42 (BST)

Year
Project
Client
Contract Description

2008

Statoil Gjoa Project -Norway

Technip Norge AS

Fabrication and Project Management Contract for the manufacture of 8-No 36” diameter pipeline initiation piles and two specially designed 36” followers
2008
OMV MAARI  FPSO AUSTRALIA
Acergy FE Pte Ltd Singapore
Rental of 96"SEA STEEL FAST FRAME for the installation of 10 -No. 84" dia. x 33m long x 80 Tonne mooring piles. Water depth 100m
Rental of 2-No. standard    84” Pile Upending Tools
2007 NEXEN ETTRICK FPSO SCOTLAND
Sonsub Ltd
Saipem SA
Rental of 84" SEA STEEL FAST FRAME for the installation of 9 -No. 84" dia. x 50m long x 100 Tonne mooring piles. Water depth 110m
2007
PEMEX KMZ FPSO Mexico
Aker Marine Contractors
Rental of 84" SEA STEEL FAST FRAME for the installation of 12 -No. 84" dia. x 45m lg x 140Tonne mooring piles. Water depth 98m
2007
Statoil Åsgard Project Norway
Technip Offshore Norway AS

Rental of 36" SEA STEEL FAST FRAME for the installation of 2-No. 36" dia. x 1.5" wt. x 18m long pipeline initiation piles, water depth 380m

2007
Statoil Tyrihans
Acergy Offshore Norway AS
Rental of 72" & 60” pile upending tools for the installation of 2-No. 60" dia. x 2” wt. 25mlg. mooring piles. Water depth 150m.

2006

Britannia Project

Acergy UK Ltd

Supply of offshore personnel to prepare and operate S200 pilling spread.

2006

Statiol Volve Project FPSO

Acergy Offshore Norway AS

Rental of 84" SEA STEEL FAST FRAME & 72" pile upending tools for the installation of 9 -No. 72" dia. x 2.5" wt. x33m lg. mooring piles. Water depth 100m.

2006

Marathon Alvheim FPSO

Technip Offshore Norway AS

Rental of 72" & pile upending tools for the installation of 12-No. 72" dia. x 2.5” wt. x 25m lg. mooring piles. Water depth 120m.

2006

Tweedsmuir Project

Sonsub Ltd

Supply of IHC S90-S280 Upending Frame & 24" pile upending tools + personnel

2006

BP Schiehallion (vessel Wellservicer)

Technip Offshore UK Ltd

Rental of 36" SEA STEEL FAST FRAME for the installation of 2-No. 36" dia. x1.5" wt. x 29m long riser base piles in 3kPa soils. Water depth 390m.

2005

DEAPS Deepwater WROV driven piling system

Perry Slingsby Inc.

3 Party J.V. R&D project :Paid Study. Investigation into the feasibility of driving IHC S90/S200 in 1,500m to 2,000m water depth by WROV using a standard 60” SEA STEEL FAST FRAME
2005
MISC South Angsi Project Malaysia (vessel Rockwater II)
Subsea 7 (SGP) Ltd
Rental of 60” followers and 60” SEA STEEL FAST FRAME for installation of 14 - No. 60” dia. x 1.5" w.t. x 25m long. FSO mooring piles. Water depth 72m
2005
Statoil Åsgard Project Norway
Technip Offshore Norway AS
Rental of 36" SEA STEEL FAST FRAME for the installation of 2-No. 36" dia. x 1.5" wt. x 18m long pipeline initiation piles, water depth 380m.
2005
Statoil Sleipner - Langeled Project Norway
Aker Marine Contractors AS
Rental of 36" SEA STEEL FAST FRAME and pile upending tools for the installation of 8 - No. 36” dia. x 1.5" w.t. x 13m long trawl hook piles, wellhead protection, water depth 85 m.
2004
Statoil Åsgard Project Norway
Technip Offshore Norway AS
Rental of 36" SEA STEEL FAST FRAME for the installation of 2-No. 36" dia. x 1.5" wt. x 18m long pipeline initiation piles. Water depth 380m.
2004

Husky - White Rose Newfoundland (vessel Constructor)

Technip Offshore ( Canada ) Ltd
Rental of 84" SEA STEEL FAST FRAME  for the installation of 10-No. 84" dia. x 2.5" wt. x 33.5m long FPSO mooring piles.  Water depth 180m.

2004

Husky - White Rose Newfoundland(vessel Constructor)

Technip Offshore ( Canada ) Ltd

Rental of 36" SEA STEEL FAST FRAME for the installation of 14-No. 24" dia. x 25.4" wt. x 18m long riser base piles.  Water depth 180m.

2004

Statoil Åsgard Dev. (vessel Wellservicer)

Technip Offshore   Norge AS

Rental of 36" SEA STEEL FAST FRAME with extensions (36FFX) for the inst. of 2-No. 36" dia. x 25.4" wt. x 15m long pipeline initiation piles. Water depth 320m. 

2004

Shell Howe Development

Technip Offshore ( UK ) Ltd

Rental of 24" pile upending tools

2004 2003

Statoil Kristin Project

(vessel Seaway Eagle)

Stolt Offshore A/S

Rental of 36" SEA STEEL FAST FRAME  for the installation of 12-No. 36" dia. x 1.5" wt. x 18m long pipeline initiation piles.  Water depth 350m.

2003

SBM PM3 Project

Subsea 7 (SGP) Ltd

Rental of 60" followers and 60" SEA STEEL FAST FRAME for installation of 8 - No. 60" dia. x1.5" w.t. x 30m long. FPSO mooring piles. Water depth 90m

2003

Penguins Subsea Field Development

Subsea 7 ( UK )

Design and rental of IHC S90-S280 hammer/follower upending frame, 16 - No. 24" pile upending tool

2002

Shell EIUSC Kestrel Project             

Subsea 7 ( UK )

Rental of followers and 30" for installation of 9 - No. 30" dia. x1.5" w.t. x 20m long. wellhead fishery protection piles. Water depth 167m.

2002

BG Juno Development

Coflexip Stena Offshore Ltd

Rental of 30" followers and pile upending tools

2002

BP Mirren/Madoes (Vessel Discovery)

Stolt Offshore Ltd

Rental of 36" SEA STEEL FAST FRAME for the installation of 2 - No. 30" dia. x 1.0" w.t. x 19m long pipeline initiation piles.

2002

Statoil Gulfaks A&C (Vessel Discovery)

Stolt Offshore A/S

Rental of 30" and pile deployment tools for the installation of 8 - No. 30" dia. x1.5" w.t. x 20m long trawl piles, wellhead protection. Water depth 225m.

2002

BP Schiehallion (Vessel Wellservicer)

Coflexip Stena Offshore Ltd

Rental of 36" SEA STEEL FAST FRAME  for the installation of 2-No. 36" dia. x1.5" wt. X 28m long riser base piles in 3kPa soils. Water depth 390m.

2002

Conoco CMS     (Vessel Discovery)

Stolt Offshore Ltd

Rental of 36" SEA STEEL FAST FRAME   for the installation of 2 - No. 30" dia. x 1.0" w.t. x 19m long pipeline initiation piles. Water depth 90m.

2001

Modec Langsa FPSO Moorings

Halliburton Far East

Engineering and supply of pile followers &
SEA STEEL FAST FRAME for inst. of 8 -No. 54" dia. x 34m long mooring piles in 3kPa soils

2001

Malongo Field Offshore Cabinda Angola   (Vessel Constructor)

SBM

Rental of 36" SEA STEEL FAST FRAME for the installation of 1-No. PLEM & 6 - No.36" dia. x1" wt. x 20metre long anchor piles in 3kPa soils. Water depth 25metres.

2001

" Kursk" submarine recovery

IHC/Smit International

Preparation of feasibility study for the removal of the bow section of the damaged submarine. Developing procedures using saw wires, SEA STEEL FAST FRAME, 2-No. anchor piles in water depth 110 metres.

2001

Monaco Harbour extension

Monaco Port Auth. Dragados

Design of mooring padeyes for 72", 60" and 42" dia. anchor piles and pile design input.

2000

Texaco Erskine (Vessel Far Sovereign

EMC

Rental of 36" SEA STEEL FAST FRAME & upending tool for the installation of a 36" dia. x 1.5" wt. x 21m long initiation pile in 110m water depth.

2000

Talisman Claymore (Vessel Far Sovereign)

EMC

Rental of 36" SEA STEEL FAST FRAME & upending tool for the installation of a 36" dia. x 2" wt. x 21.5m long initiation pile in 110m water depth.

2000

Banff STL Moorings (Vessel Wellservicer)

Coflexip Stena Offshore Ltd

Provision of 72" followers & FINNED FRAME BY SEA STEEL for 8 - No 72" dia. x 30m long mooring piles

2000

Snorre B (Vessel Far Sovereign)

EMC/Norsk Hydro

Rental of 36" SEA STEEL FAST FRAME  : & upending tool for the installation of a 36" dia. x 1" wt. X 15 750 long initiation pile in 150m water depth.

1999

Anemometer Mast East Coast, England

RES Ltd

Design, construction, inst. of piled East Coast, England offshore anemometer mast for researching environmental data prior to the installation of wind turbines.

1998

Bluewater Flora

Rockwater

Project management / design development / construction and installation of 2-No. 55T Ballasted Suction Riser Bases. 

1998

IBC Moorings and Anchoring Conference

SEA STEEL

SEA STEEL presented a paper on the method of calculating the cost comparison between suction and impact driven piles.

1997

SBM Aquila

SaiClo

Prepared detailed technical feasibility analysis for suction installation techniques for suction operations in 850m water depth.

1997

Chevron Alba

JPK

Prepare DCMA specifications & detailed inst. procedures and design using the legs for suction.

1997

BP Schiehallion

SBM

Provide site representation and reporting for the installation of 14 - No. 127 tonne suction driven mooring anchors aboard the AHT "Maersk Puncher." Depth 390m.

1997

BP Schiehallion Dev.

SBM

Provide site representation & reporting for the installation & lay and connection of 14 - No. chain & plastic coated mooring lines from the "Maersk Battler" AHT at 390m water depth.

1997

BP Schiehallion (Vessel Wellservicer)

IHC

Aboard the "Wellservicer" provide site representation & tech. assistance for the installation of 12 - No. 30" dia. riser base piles, water depth 390m.

1997

BP Schiehallion

Coflexip

Design/Cost evaluation Suction Riser Bases. Preparation of detailed design reports for Suction Riser Bases & impact driven piles incl. fabrication drgs.

1996

Bluewater Fergus

Rockwater

Project management / design development / construction and installation of 1 - No. Ballasted 52 T Suction Riser Base.

1995

NORSKHYDRO Troll Olje

Rockwater/SCS

Project management / design development for 84" dia. anchor piles stabbed directly into the seabed without using a frame.

1995

BLUEWATER  Fife/Gorm

Rockwater/SCS

Project management / design development of piling equipment for 60" dia. FPSO anchor piles stabbed indirectly into the sea- bed using an alignment frame.

;