Year |
Project |
Client |
Contract Description |
| 2008 |
Statoil
Gjoa Project -Norway |
Technip
Norge AS
|
| Fabrication
and Project Management Contract for the manufacture of 8-No
36” diameter pipeline initiation piles and two specially
designed 36” followers |
|
| 2008 |
OMV
MAARI FPSO AUSTRALIA |
Acergy
FE Pte Ltd Singapore |
Rental of 96"  for
the installation of 10 -No. 84" dia. x 33m long x 80
Tonne mooring piles. Water depth 100m |
Rental of 2-No. standard 84” Pile
Upending Tools |
|
| 2007 |
NEXEN
ETTRICK FPSO SCOTLAND |
Sonsub
Ltd
Saipem SA |
Rental
of 84" for
the installation of 9 -No. 84" dia. x 50m long x 100 Tonne
mooring piles. Water depth 110m |
| 2007 |
|
|
Rental of 84"  for
the installation of 12 -No. 84" dia. x 45m lg x 140Tonne
mooring piles. Water depth 98m |
| 2007 |
Statoil Åsgard
Project Norway
|
Technip Offshore
Norway AS
|
Rental of 36" for
the installation of 2-No. 36" dia. x 1.5" wt. x 18m
long pipeline initiation piles, water depth 380m |
| 2007 |
|
Acergy Offshore Norway AS
|
Rental of 72" & 60” pile
upending tools for the installation of 2-No. 60" dia. x
2” wt. 25mlg. mooring piles. Water depth 150m. |
|
|
Britannia Project |
|
Supply
of offshore personnel to prepare and operate S200 pilling
spread. |
|
|
Statiol Volve Project FPSO |
|
Rental of 84"  & 72" pile
upending tools for the installation of 9 -No. 72" dia.
x 2.5" wt. x33m lg. mooring piles. Water depth 100m. |
|
|
Marathon Alvheim FPSO |
|
Rental
of 72"  & pile
upending tools for the installation of 12-No. 72" dia.
x 2.5” wt.
x 25m lg. mooring piles. Water depth 120m. |
|
|
Tweedsmuir Project |
|
Supply
of IHC S90-S280 Upending Frame & 24" pile upending tools
+ personnel |
|
|
BP Schiehallion (vessel Wellservicer) |
|
Rental
of 36"  for
the installation of 2-No. 36" dia. x1.5" wt. x 29m long
riser base piles in 3kPa soils. Water depth 390m. |
|
|
DEAPS
Deepwater WROV driven piling system |
|
3
Party J.V. R&D project :Paid Study. Investigation into
the feasibility of driving IHC S90/S200 in 1,500m to 2,000m
water depth by WROV using a standard 60”  |
| 2005 |
MISC
South Angsi Project Malaysia (vessel Rockwater II)
|
|
Rental
of 60” followers and 60”  for
installation of 14 - No. 60” dia. x 1.5" w.t.
x 25m long. FSO mooring piles. Water depth 72m
|
| 2005 |
Statoil Åsgard
Project
Norway
|
Technip
Offshore Norway AS
|
Rental
of 36"  for
the installation of 2-No. 36" dia. x 1.5" wt.
x 18m long pipeline initiation piles, water depth 380m.
|
| 2005 |
Statoil
Sleipner - Langeled Project Norway
|
Aker
Marine Contractors AS
|
Rental
of 36"  and
pile upending tools for the installation of 8 - No. 36”
dia. x 1.5" w.t. x 13m long trawl hook piles, wellhead
protection, water depth 85 m.
|
| 2004 |
Statoil Åsgard
Project
Norway
|
Technip
Offshore Norway AS
|
Rental
of 36"  for
the installation of 2-No. 36" dia. x 1.5" wt.
x 18m long pipeline initiation piles. Water depth 380m.
|
| 2004 |
Husky - White Rose Newfoundland (vessel
Constructor) |
Technip
Offshore (
Canada
)
Ltd
|
Rental
of 84" for the installation
of
10-No. 84"
dia. x 2.5" wt. x 33.5m long FPSO mooring piles. Water
depth 180m.
|
| |
Husky - White Rose Newfoundland(vessel Constructor) |
Technip
Offshore (
Canada
) Ltd |
Rental
of 36" for
the installation of 14-No. 24" dia. x 25.4" wt. x 18m long riser base
piles. Water depth 180m. |
| |
Statoil Åsgard
Dev. (vessel Wellservicer) |
Technip
Offshore
Norge
AS |
Rental
of 36" with
extensions (36FFX) for the inst. of 2-No. 36" dia. x 25.4" wt.
x 15m long pipeline initiation piles. Water depth 320m. |
| |
Shell Howe Development |
Technip
Offshore (
UK
) Ltd |
Rental
of 24" pile upending tools
|
| 2004
2003 |
Statoil Kristin Project
(vessel
Seaway Eagle) |
Stolt Offshore A/S |
Rental
of 36" for the installation of 12-No. 36" dia. x 1.5"
wt. x 18m long pipeline initiation piles. Water depth 350m. |
| 2003 |
SBM PM3 Project |
Subsea 7 (SGP) Ltd |
Rental
of 60" followers and 60" for
installation of 8 - No. 60" dia. x1.5" w.t.
x 30m long. FPSO mooring piles. Water depth 90m |
| 2003 |
Penguins Subsea Field Development |
Subsea 7 (
UK
) |
Design
and rental of IHC S90-S280 hammer/follower upending frame,
16 - No. 24" pile upending tool |
| 2002 |
Shell EIUSC Kestrel Project |
Subsea 7 (
UK
) |
Rental
of followers and 30" for
installation of 9 - No. 30" dia. x1.5" w.t.
x 20m long. wellhead fishery protection piles. Water depth
167m. |
| 2002 |
BG Juno Development |
Coflexip Stena Offshore Ltd |
Rental
of 30" followers and pile upending tools
|
| 2002 |
BP
Mirren/Madoes (Vessel Discovery) |
Stolt Offshore Ltd |
Rental
of 36" for
the installation of 2 - No. 30" dia. x 1.0" w.t.
x 19m long pipeline initiation piles. |
| 2002 |
Statoil
Gulfaks A&C (Vessel Discovery) |
Stolt Offshore A/S |
Rental
of 30" and pile deployment tools for the installation of
8 - No. 30" dia. x1.5" w.t. x 20m long
trawl piles, wellhead protection. Water depth 225m. |
| 2002 |
BP
Schiehallion (Vessel Wellservicer) |
Coflexip Stena Offshore Ltd |
Rental
of 36" for the installation
of
2-No. 36"
dia. x1.5" wt. X 28m long riser base piles in 3kPa soils.
Water depth 390m. |
| 2002 |
Conoco
CMS (Vessel Discovery) |
Stolt Offshore Ltd |
Rental
of 36" for
the installation of 2 - No. 30" dia. x 1.0" w.t.
x 19m long pipeline initiation piles. Water depth 90m. |
| 2001 |
Modec Langsa FPSO Moorings |
Halliburton
Far East |
Engineering
and supply of pile followers &
for
inst. of 8 -No. 54" dia. x 34m long mooring
piles in 3kPa soils |
| 2001 |
Malongo
Field Offshore Cabinda
Angola
(Vessel
Constructor) |
SBM |
Rental
of 36" for
the installation of 1-No. PLEM & 6 - No.36"
dia. x1" wt. x 20metre long anchor piles in 3kPa soils.
Water depth 25metres. |
| 2001 |
"
Kursk" submarine recovery |
IHC/Smit
International |
Preparation
of feasibility study for the removal of the bow section of the
damaged submarine. Developing procedures using saw wires, ,
2-No. anchor piles in water depth 110 metres. |
| 2001 |
Monaco
Harbour extension |
Monaco
Port Auth. Dragados |
Design
of mooring padeyes for 72", 60" and 42" dia.
anchor piles and pile design input. |
| 2000 |
Texaco
Erskine (Vessel
Far Sovereign |
EMC
|
Rental
of 36" & upending tool for the installation of a 36"
dia. x 1.5" wt. x 21m long initiation pile in 110m water
depth. |
| 2000 |
Talisman
Claymore (Vessel Far Sovereign) |
EMC |
Rental
of 36" & upending tool for the installation of a 36"
dia. x 2" wt. x 21.5m long initiation pile in 110m water
depth. |
| 2000 |
Banff
STL Moorings (Vessel Wellservicer) |
Coflexip
Stena Offshore Ltd |
Provision
of 72" followers & for
8 - No 72" dia. x 30m long mooring piles |
| 2000 |
Snorre
B (Vessel
Far Sovereign) |
EMC/Norsk
Hydro |
Rental
of 36" : & upending tool
for the installation of a 36" dia. x 1" wt. X 15
750 long initiation pile in 150m water depth. |
| 1999 |
Anemometer
Mast
East Coast,
England
|
RES
Ltd |
Design,
construction, inst. of piled
East
Coast,
England
offshore anemometer mast for researching environmental data
prior to the installation of wind turbines. |
| 1998 |
Bluewater
Flora |
Rockwater
|
Project
management / design development / construction and installation
of 2-No. 55T Ballasted Suction Riser Bases. |
| 1998 |
IBC
Moorings and Anchoring Conference |
SEA
STEEL |
SEA
STEEL presented a paper on the method of calculating the
cost comparison between suction and impact driven piles. |
| 1997 |
SBM
Aquila |
SaiClo |
Prepared
detailed technical feasibility analysis for suction installation
techniques for suction operations in 850m water depth. |
| 1997 |
Chevron
Alba |
JPK |
Prepare
DCMA specifications & detailed inst. procedures and
design using the legs for suction. |
| 1997 |
BP
Schiehallion |
SBM
|
Provide
site representation and reporting for the installation of
14 - No. 127 tonne suction driven mooring anchors aboard
the AHT "Maersk Puncher." Depth
390m. |
| 1997 |
BP
Schiehallion Dev. |
SBM
|
Provide
site representation & reporting for the installation &
lay and connection of 14 - No. chain & plastic coated mooring
lines from the "Maersk Battler" AHT at 390m water
depth. |
| 1997 |
BP
Schiehallion (Vessel Wellservicer) |
IHC |
Aboard
the "Wellservicer" provide site representation &
tech. assistance for the installation of 12 - No. 30" dia.
riser base piles, water depth 390m. |
| 1997 |
BP
Schiehallion |
Coflexip |
Design/Cost
evaluation Suction Riser Bases. Preparation of detailed
design reports for Suction Riser Bases & impact driven
piles incl. fabrication drgs. |
| 1996 |
|
Rockwater |
Project
management / design development / construction and installation
of 1 - No. Ballasted 52 T Suction Riser Base. |
| 1995 |
NORSKHYDRO Troll
Olje |
Rockwater/SCS
|
Project
management / design development for 84" dia. anchor
piles stabbed directly into the seabed without using a
frame. |
| 1995 |
BLUEWATER Fife/Gorm |
Rockwater/SCS
|
Project
management / design development of piling equipment for
60" dia. FPSO anchor piles stabbed indirectly into
the sea- bed using an alignment frame. |