OMV Maari Project Completed in Record Time

Friday, May 1st, 2009

Installation of 8 – No. 84” FPSO mooring piles for the OMV Maari Project completed in record time

 

 

IHC Sea Steel’s new larger capacity 96” FAST FRAME (96FF) has, in record time, completed the installation of 8-No. 84” diameter FPSO mooring piles on the OMV Maari Project,  offshore New Zealand.
During the engineering phase, 2-No. 84” diameter mid-water arch piles were added to the workscope and these were installed at the same time. The Frame weighs 125 Tonnes.

2-No. standard 84” pile upending tools were hired to efficiently upend and deploy the piles to the 96FF, the Frame accurately orientated the heading of the piles well within the required tolerances.

Tags: , ,
Posted in 96FF | No Comments »

  • Alpha Ventus Project, First German Offshore Windfarm

      IHC Sea Steel was engaged by NorWind to provide engineering services to design and implement a method to install jacket foundations for wind turbines, consisting of 4 piles to be installed within a. […]



  • Blacktip Project, Offshore Australia

      In a new association, TS Marine Pty Ltd contracted IHC Sea Steel to provide a 60” Fast Frame (60FF) for the installation of 6 – No. 60” diameter mooring anchor piles.  All piles were success. […]



  • First for IHC Sea Steel at Al Shaheen Field

      The 72” Slotted Frame (72SF) was fitted with a removable sleeve insert to enable the installation of both 60” mooring piles and 48” backdown piles with the deployment of just one piling frame. […]



  • Taurt Development Upending Tool Hire

      IHC Sea Steel was contacted by Saipem UK (Sonsub Division) to rent 2 – No. 24″ Pile Upending Tools for a fixed term of 6 months.



  • Gjoa Project Successfully Completed

        IHC Sea Steel was contracted by Technip Offshore Norge AS to supply 1 – No. 36” Fast Frame with folding mudmat extensions (36FFX), 2 – No. 36” Followers and 2 – No. 36” Pile Upending. […]



  • Sea Steel Acquired by IHC Merwede

      In April 2008 IHC Merwede B.V. purchased 100% shares in Sea Steel Ltd and its subsidiaries. The company will now operate under the name of IHC Sea Steel Ltd.   Mr Carl Mogg has been appointed the. […]