2011
Q4 |
Kangean - Terang Sirasan Batur Field |
BW Offshore |
||
96" Slotted Frame |
84" |
12 |
~95m |
|
Successful installation of 12 - No. 84" FPSO mooring piles with the 96" Slotted Frame in a quick and successful installation turn around. Pile installation phase took only 8 days from start to completion. |
||||
Q1 |
Kitan Field - Australia |
Acergy Singapore |
||
96" Slotted Frame |
72" |
6 |
~305m |
|
Successful installation of 6 - No. 72" FPSO mooring piles with the 96" Slotted Frame. This project was very challenging with a quick preparation period of less than 6 weeks. |
||||
2010
Q4 |
Al Shaheen SPM 2 - Qatar |
Acergy Singapore |
||
96" Slotted Frame |
60" |
9 |
~70m |
|
Contracted to supply 1 No. 96" Slotted Frame and additional lifting tools to install 9 - No. 60" SPM mooring piles. This project was efficiently completed with high accuracy |
||||
Q3 |
Chim Sao Black Field - Vietnam |
CTC Marine |
||
96" Slotted Frame |
80" |
9 |
~95m |
|
Successful installation of 9 - No. 80" FPSO mooring piles with the 96" Slotted Frame. |
||||
2009
Q2 |
Al Shaheen SPM 1 & 3 - Qatar |
Acergy Singapore |
||
96" Slotted Frame |
60" & 48" |
9 |
~70m |
|
Contracted to supply 1 - No. 96" Slotted Frame, lifting tools and a 48" Sleeve Insert to install 18 - No. 60" SPM mooring piles and 10 - No. 48" backdown piles. This project completed in good time with both SPM buoys and all backdown piles installed in 32 day campaign. |
||||
Q2 |
Alpha Ventus - Germany |
Norwind |
||
72" Slotted Frame |
60" |
20 |
~30m |
|
Contracted to supply 1 - No. 72" Slotted Frame and template for an accurate pre-piling windfarm jacket installation. It was a challenging project, however the installation tolerances were excellent. |
||||
2007
Q1 / Q2 |
Tyrihans - Norway |
Acergy Norway AS |
||
72" Slotted Frame |
60" |
2 |
~300m |
|
Contracted to supply 1 - No. 72" Slotted Frame to install 2 - No. initiation piles for 2 new pipelinens to join the Kristin and Ã…sgard platform.
|
||||
2006
Q2 |
Marathon Alvheim - Norway |
Technip Offshore Norge AS |
||
72" Slotted Frame |
72" |
12 |
~180m |
|
Contracted to supply 1 - No. 72" Slotted Frame and lifting tools to install 12 - No. FPSO mooring piles.
|
||||