2009

 

Q2

 

Gjoa Project

 

Technip Norway

 

24" Pile Upending Tool

 

24"

 

2

 

480m

 

  These tools were used to lift and install 2 - No. 24" piles on location

 

News & Events

96" Fast Frame - Gumusut Kakap installation

96" Fast Frame used to install Gumusut field moorings

The Gumusut field was a very challenging installation where the 96" Fast Frame was put through its paces. Not only was this the deepest...Read more ...

96" Fast Frame with levelling capability

96FF Levelling system Launch

On Thursday the 12 August IHC Sea Steel has hosted a successful launch of our new 96" Fast Frame...Read more ...