Hammer Support Frame Projects

  2008

 

Q2

 

Gjoa Project

 

Technip Norway

 

Hammer Support Frame

 

36"

 

6

 

480m

 

  The project required a hammer support frame that would allow for a hammer with a support

  facility to allow a long follower to be supported during transit. This frame saved ample

  hammer handling time and made the operation safer.

 

News & Events

96" Fast Frame - Gumusut Kakap installation

96" Fast Frame used to install Gumusut field moorings

The Gumusut field was a very challenging installation where the 96" Fast Frame was put through its paces. Not only was this the deepest...Read more ...

96" Fast Frame with levelling capability

96FF Levelling system Launch

On Thursday the 12 August IHC Sea Steel has hosted a successful launch of our new 96" Fast Frame...Read more ...