2011
Q4 |
Montara - Timor Sea |
Sapura Acergy PTY Ltd |
||
96"Fast Frame |
96" |
9 |
~80m |
|
Successful installation of 9 - No. 96" FPSO mooring piles with the 96" Fast Frame. This project was executed very well and a successful campaign. |
||||
Q3 |
S397 - Iraq |
Leighton International |
||
36" Fast Frame |
36" |
18 |
~30m |
|
Installed 18 mooring piles for 2 SPM offloading bouys in this region. This was a very challenging project with a lot of unique challenges we had to overcome. All the piles installed to the clients specifications. |
||||
Q2 |
Hibernia OLS Replacement - Canada |
Technip Canada |
||
84" Fast Frame |
72" |
2 |
~83m |
|
Installed 2 replacement Offshore Loading System (OLS) piles with a tight vertical tolerance of 1°. This project was challenging due to soil conditions in the area and the requirement to use our new Levelling system on the 84" Fast Frame to ensure the tight installation tolerances. |
||||
Q2 |
TGT White Rhino - Vietnam |
DOF Subsea |
||
60" Slotted Frame |
65" |
5 |
~40m |
|
Installed the remainding 5 - No. FPSO mooring piles. |
||||
2010
Q4 |
Gumusut Kakap - Malaysia |
Acergy Singapore |
||
96" Fast Frame |
84" |
32 |
~1200m |
|
Contracted to supply 1 - No. 96" Fast Frame to install 12 FPSO mooring piles and 20 other piles in our deepest water project to date. This frame incorporated full levelling controlled by the WROV without the need to have surface supplied umbilicals. |
||||
Q4 |
TGT White Rhino - Vietnam |
CTC Marine Projects Ltd. |
||
60" Slotted Frame |
65" |
7 |
~40m |
|
Installed the remainding 7 - No. FPSO mooring piles. |
||||
Q2 |
BP Devenick S1 - Scotland |
Technip UK Ltd. |
||
36" Fast Frame |
24" |
1 |
~120m |
|
Contracted to supply 1 - No. 24" Fast Frame to install 1 - No. pipeline initiation pile to tie back to the East Brae platform.
|
||||
2009
Q4 |
Peregrino - Brazil |
Technip Offshore Norge AS |
||
84" Fast Frame |
84" |
10 |
~100m |
|
Contracted to supply 1 - No. 84" Fast Frame to install 10 FPSO mooring piles for a new FPSO to be installed in the Peregrino field. This project was concluded successfully with excellent feedback from our clients for the operation of the equipment. |
||||
Q3 |
Vincent / Enfield - Australia |
TS Marine PTY Ltd. |
||
36" Fast Frame |
30" |
4 |
~480m |
|
Contracted to supply 1 - No. 36" Fast Frame to install 4 pre-drived conductors in the Enfield and Vincent fields for new wells to be commisioned. Due to the extremely soft soil conditions experienced on location, large mudmats extensions were required for frame stability. |
||||
Q3 |
Ruby - Vietnam |
SWG Offshore |
||
60" Fast Frame |
65" |
9 |
~50m |
|
Contracted to supply 1 - No. 60" Fast Frame to install 9 FPSO mooring piles in this field.
|
||||
Q2 |
Black Tip - Australia |
TS Marine PTY Ltd. |
||
60" Fast Frame |
60" |
6 |
~25m |
|
Contracted to supply 1 - No. 60" Fast Frame to install 6 mooring piles. |
||||
Q2 |
North Amethyst - Canada |
Technip Canada |
||
36" Fast Frame |
36" |
4 |
~120m |
|
Contracted to supply 1 - No. 36" Fast Frame to install 4 pin piles to support the existing pipeline.
|
||||
2008
Q3 |
Gjøa - Norway |
Technip Norge AS |
||
36" Fast Frame |
36" |
6 |
~360m |
|
Contracted to supply 1 - No. 36" Fast Frame to install 6 initiation piles to allow for the installation of the in-field and export pipelines towards the tie-in structure. This project was successfully concluded including the management of pile fabrications. |
||||
Q1 |
Maari - New Zealand |
Acergy Singapore PTE Ltd. |
||
96" Fast Frame |
84" |
8 |
~100m |
|
Contracted to supply 1 - No. 84" Fast Frame to install 8 FPSO mooring piles.
|
||||
2007
Q2 |
Ettrick - Scotland |
Saipem UK Ltd. |
||
84" Fast Frame |
84" |
9 |
~111m |
|
Contracted to supply 1 - No. 84" Fast Frame to install 9 FPSO mooring piles. |
||||
Q2 |
Kelvin - North Sea |
Subsea 7 |
||
36" Fast Frame |
30" |
1 |
~30m |
|
Contracted to supply 1 - No. 36" Fast Frame to install 1 pipeline initiation pile to connect the Kelvin Field back to the Murdock MD platform. |
||||
Q2 |
CNR Lyell - North Sea |
Acergy UK Ltd. |
||
36" Fast Frame |
24" |
2 |
~143m |
|
Contracted to supply 1 - No. 36" Fast Frame to install 2 pipeline initiation piles. |
||||
Q1 |
PEMEX KuMaZa - Mexico |
Aker Marine Contractors AS |
||
84" Fast Frame |
84" |
12 |
~100m |
|
Contracted to supply 1 - No. 84" Fast Frame to install 12 FPSO mooring piles. |
||||
2006
Q2 |
Sleipner Volve - Norway |
Acergy Offshore Norway AS |
||
84" Fast Frame |
72" |
9 |
~95m |
|
Contracted to supply 1 - No. 84" Fast Frame to install 9 FPSO mooring piles. |
||||
Q2 |
BP Schiehallion - North Sea |
Technip Offshore UK Ltd. |
||
36" Fast Frame |
36" |
2 |
~395m |
|
Contracted to supply 1 - No. 36" Fast Frame to install 2 NWAD Riser piles. |
||||
2005
Q2 |
MISC South Angsi - FSO - Malaysia |
Subsea 7 |
||
60" Fast Frame |
60" |
14 |
~72m |
|
Contracted to supply 1 - No. 60" Fast Frame to install 14 FSO Mooring piles. |
||||
Q2 |
Langeled Sleipner A - Norway |
Aker Marine Contractors AS |
||
60" Fast Frame |
60" |
8 |
~110m |
|
Contracted to supply 1 - No. 36" Fast Frame to install 8 initiation piles for the Langeled pipeline installation. |
||||