Hammer Upending Frame


IHC Sea Steel’s Hammer Upending Frame has been designed to upend IHC Hydrohammer’s S90, S200 and S280 hammers with a sleeve size suitable for piles up to 36” in diameter.


The Frame is designed with two hammer positions; one inboard for transfer and one outboard for upending. The frame has guide rails and staging to the front to allow safe access to the umbilicals and sleeve whilst upending.


HAMMER UPENDING TOOL ON DECKHAMMER UPENDING TOOL IN USE


Data Sheet can be found by clicking on the link below:



  • Alpha Ventus Project, First German Offshore Windfarm

      IHC Sea Steel was engaged by NorWind to provide engineering services to design and implement a method to install jacket foundations for wind turbines, consisting of 4 piles to be installed within a. […]



  • Blacktip Project, Offshore Australia

      In a new association, TS Marine Pty Ltd contracted IHC Sea Steel to provide a 60” Fast Frame (60FF) for the installation of 6 – No. 60” diameter mooring anchor piles.  All piles were success. […]



  • First for IHC Sea Steel at Al Shaheen Field

      The 72” Slotted Frame (72SF) was fitted with a removable sleeve insert to enable the installation of both 60” mooring piles and 48” backdown piles with the deployment of just one piling frame. […]



  • Taurt Development Upending Tool Hire

      IHC Sea Steel was contacted by Saipem UK (Sonsub Division) to rent 2 – No. 24″ Pile Upending Tools for a fixed term of 6 months.



  • Gjoa Project Successfully Completed

        IHC Sea Steel was contracted by Technip Offshore Norge AS to supply 1 – No. 36” Fast Frame with folding mudmat extensions (36FFX), 2 – No. 36” Followers and 2 – No. 36” Pile Upending. […]



  • Sea Steel Acquired by IHC Merwede

      In April 2008 IHC Merwede B.V. purchased 100% shares in Sea Steel Ltd and its subsidiaries. The company will now operate under the name of IHC Sea Steel Ltd.   Mr Carl Mogg has been appointed the. […]



  • OMV Maari Project Completed in Record Time

    Installation of 8 – No. 84” FPSO mooring piles for the OMV Maari Project completed in record time   Rental of 96FF Rental of 2 – No. 84” Pile Upending Tools Installation of 8 No. 84” FPSO M. […]