Finned Frame
The FINNED FRAME is used in conjunction with long followers, and normally used for riser base pile installation where the pile tops remain above the seabed. Our 30” FINNED FRAME can be used to deploy piles of 20” to 30” diameter.
The FINNED FRAME can be rigged to be deployed through the splash zone at an 20 to 30 degree angle thus reducing the hydrodynamic effects. Ballast and rigging for an inclined lift can be provided upon request.
- FINNED FRAME

