Products


Pile Support Frames


IHC Sea Steel’s proven equipment is primarily designed for deep water stand-alone impact driven piles, however, the equipment can be adapted to suit many applications. The equipment is principally directed towards the FPSO market and enables the installation contractor to perform major installations with low risk and greatly reduced costs. IHC Sea steel has been involved in the installation of many docking, riser base and anchor piles as well as pipeline initiation and wellhead protection piles.




Piling Accessories


IHC Sea Steel also offer proven Piling tools including:



  • Alpha Ventus Project, First German Offshore Windfarm

      IHC Sea Steel was engaged by NorWind to provide engineering services to design and implement a method to install jacket foundations for wind turbines, consisting of 4 piles to be installed within a. […]



  • Blacktip Project, Offshore Australia

      In a new association, TS Marine Pty Ltd contracted IHC Sea Steel to provide a 60” Fast Frame (60FF) for the installation of 6 – No. 60” diameter mooring anchor piles.  All piles were success. […]



  • First for IHC Sea Steel at Al Shaheen Field

      The 72” Slotted Frame (72SF) was fitted with a removable sleeve insert to enable the installation of both 60” mooring piles and 48” backdown piles with the deployment of just one piling frame. […]



  • Taurt Development Upending Tool Hire

      IHC Sea Steel was contacted by Saipem UK (Sonsub Division) to rent 2 – No. 24″ Pile Upending Tools for a fixed term of 6 months.



  • Gjoa Project Successfully Completed

        IHC Sea Steel was contracted by Technip Offshore Norge AS to supply 1 – No. 36” Fast Frame with folding mudmat extensions (36FFX), 2 – No. 36” Followers and 2 – No. 36” Pile Upending. […]



  • Sea Steel Acquired by IHC Merwede

      In April 2008 IHC Merwede B.V. purchased 100% shares in Sea Steel Ltd and its subsidiaries. The company will now operate under the name of IHC Sea Steel Ltd.   Mr Carl Mogg has been appointed the. […]



  • OMV Maari Project Completed in Record Time

    Installation of 8 – No. 84” FPSO mooring piles for the OMV Maari Project completed in record time   Rental of 96FF Rental of 2 – No. 84” Pile Upending Tools Installation of 8 No. 84” FPSO M. […]