|
|
THE
PROVEN
FOR
RELIABLE SUBSEA PILE ALIGNMENT
INTERNATIONAL
PATENT PCT/GB98/02541
 |
- Low
risk; eliminates outriggers, 'hanging off' and manual
rigging changeovers.
- Significant
reduction in vessel and project time.
- Eliminates
costly followers by lowering the height of the C.O.G.,
thereby, reducing the overall weight and improving
stability.
- Accurately orientates pile (and tethers)
towards FPSO centre.
- Transportable
by road in components.
- Compact
and easy to maintain.
|
|
- Frame
levelling system supplied as optional.
- Can
be used with impact or vibratory hammers.
- Only
light craneage required.
- Can
be deployed with pile pre-installed.
- Accommodates
different diameters of pile.
- Can
be used with mudmat extensions for varying soil conditions
.
|
|
|
 |
is
an innovative sub-sea piling system which cuts offshore installation
times has been successfully proven during the summer of 2000
in the North sea.
has
been designed and patented by IHC Sea Steel for
the installation of mooring riser and initiation piles ranging
from 20" to 96" in diameter. The system has been
used extensively on projects in the UK and Norway, Canada,the
Far East and Latin America.
|
The
key feature of is
the ability to drive piles to full penetration in a single operation.
The frame is placed on the seabed with the pile and tethers connected.
As the pile is driven, a ring welded around its outer surface,
near the top of the pile, triggers the frame's latching mechanism,
enabling the halves of the hinged guide sleeve to fall open.
Driving is then completed, the tether lying in the open bay of
the frame with the pile correctly orientated.
As
the frame is lifted from the seabed the sleeves automatically
close and re-latch, ready for the next pile to be inserted
without retrieval of the frame to the surface. |
|
|
 |
|
 |
Piling
operations can be performed in less than a third of the time
needed for conventional methods, reducing costly vessel time,
eliminating WROV intervention and making operations far safer.
Mobilising: :::: FAST
FRAME ::::
The is
easily set up for the task. In order to suit different pile
diameters is
mobilised with spacers fitted within the guide sleeves. Two
latch release plates matching the pile diameter are screwed
into position and the whole assembly is then tested in our
workshops using a test pile of the same diameter. The equipment
is then loaded onto transport and is ready for work.
SEA
STEEL SEA STEEL LTD,FAST+FRAME, FINNED+FRAME FAST FRAME,
FINNED FRAME, PILING, PILING+FRAMES, PILE+DRIVING, PILING+EQUIPMENT,
SUBSEA+PILING, SUBSEA ENGINEERING, PIPELINE INITIATION,
RISERS, SUCTION ANCHORS, FPSO, FPSO MOORINGS, SEA STEEL,
SEA STEEL LTD, FAST+FRAME, FINNED+FRAME, FAST FRAME,
FINNED FRAME, PILING, PILING+FRAMES, PILE+DRIVING, PILING+EQUIPMENT,
SUBSEA+PILING, SUBSEA ENGINEERING, PIPELINE INITIATION,
RISERS, SUCTION ANCHORS, FPSO, FPSO MOORINGS, SEA STEEL
|
|