LINKS
1st. Point Assessment Logo

Click here to open a PDF file of this film strip. To return to the original window click on the back button on your browser toolbar.

 

 

 

 

 

 

 

 

 

 

THE PROVEN

FOR RELIABLE SUBSEA PILE ALIGNMENT

INTERNATIONAL PATENT PCT/GB98/02541

The SEASTEEL 60" FAST FRAME in the gulf of Thailand click here to see a larger image
  • Low risk; eliminates outriggers, 'hanging off' and manual rigging changeovers.
  • Significant reduction in vessel and project time.
  • Eliminates costly followers by lowering the height of the C.O.G., thereby, reducing the overall weight and improving stability.
  • Accurately orientates pile (and tethers) towards FPSO centre.
  • Transportable by road in components.
  • Compact and easy to maintain.
  • Frame levelling system supplied as optional.
  • Can be used with impact or vibratory hammers.
  • Only light craneage required.
  • Can be deployed with pile pre-installed.
  • Accommodates different diameters of pile.
  • Can be used with mudmat extensions for varying soil conditions .
The SEASTEEL 60" FAST FRAME undergoing tests in Singapore click here to see a larger image

SEA STEEL FAST FRAME is an innovative sub-sea piling system which cuts offshore installation times has been successfully proven during the summer of 2000 in the North sea.

SEA STEEL FAST FRAME has been designed and patented by IHC Sea Steel for the installation of mooring riser and initiation piles ranging from 20" to 96" in diameter. The system has been used extensively on projects in the UK and Norway, Canada,the Far East and Latin America.

The key feature of SEA STEEL FAST FRAME is the ability to drive piles to full penetration in a single operation. The frame is placed on the seabed with the pile and tethers connected. As the pile is driven, a ring welded around its outer surface, near the top of the pile, triggers the frame's latching mechanism, enabling the halves of the hinged guide sleeve to fall open. Driving is then completed, the tether lying in the open bay of the frame with the pile correctly orientated.

As the frame is lifted from the seabed the sleeves automatically close and re-latch, ready for the next pile to be inserted without retrieval of the frame to the surface.

The SEASTEEL stand at Offshore Europe 2003

FAST FRAME  mobilisation
Click here to view a larger image

Piling operations can be performed in less than a third of the time needed for conventional methods, reducing costly vessel time, eliminating WROV intervention and making operations far safer.


Mobilising: :::: FAST FRAME ::::
The SEA STEEL FAST FRAME is easily set up for the task. In order to suit different pile diameters SEA STEEL FAST FRAME is mobilised with spacers fitted within the guide sleeves. Two latch release plates matching the pile diameter are screwed into position and the whole assembly is then tested in our workshops using a test pile of the same diameter. The equipment is then loaded onto transport and is ready for work.

Requires Windows Media Player.

Underwater