Year
|
Project |
Client |
|
2009
|
Vincent Project |
- TS Marine Pty Ltd
- 36FF rental
- Design and construction of bolt-on mudmat extensions
- Installation of 4 – No. oil well conductors
- Water depth: 400m
|
| Ruby Project |
- SWG
- 60FF rental
- Installation of 9 – No. 65” diameter mooring piles
- Water depth: 50m
|
| Alpha Ventus Project |
- Norwind
- Alpha Ventus, first German Offshore Windfarm
- 72” Slotted Frame rental
- Development and fabrication of pile alignment template
- Installation of 24 – No. 72” pre-installed jacket piles
- Water depth: 30m
|
| North Amethyst Project |
- Technip Canada Ltd
- 36FFX rental (folding mudmat extensions)
- Installation of 6 – No. pipeline tie-down piles
- Water depth: 120m
|
| Windfarm Animation |
- IHC Offshore Systems BV
- Produce an animation to show the process of installing wind
turbine structures using a dedicated, specialist ship
|
| Blacktip Project |
- TS Marine Pty Ltd
- 60FF Rental
- Installation of 6 – No. 60” diameter Piles
- Water depth: 40m
|
| Al Shaheen Project |
- Acergy Singapore Pte Ltd
- 72SF Rental
- 48” and 60” Pile Upending Tool Rental
- Installation of 30 – No. 60” diameter mooring piles
- Water depth: 59m
|
|
2008
|
Gjøa Project |
- Technip Norge AS
- 36FFX Rental
- Fabrication of 8 – No. 36” Piles and 2 – No. 36” Followers
- Installation of 8 – No. 36” diameter pipeline initiation piles
- Water depth: 360m
|
| OMV Maari Project |
- Acergy Singapore Pte Ltd
- 96FF Rental
- 84” Pile Upending Tool Rental
- Installation of 10 – No. 84” diameter mooring piles
- Water depth: 100m
|
|
2007
|
Nexen Ettrick Project |
- Saipem UK Ltd (Sonsub Division)
- 84” Fast Frame Rental
- Installation of 9 – No.84” diameter mooring piles
- Water depth: 110m
|
| CNR Lyell Project |
- Acergy UK Ltd
- 36FFX with Folding Mudmat Extensions Rental
- Installation of 2 – No. 36” diameter pipeline installation piles
- Water depth: 145m
|
| Kelvin Development Project |
- Subsea 7 (UK) Ltd
- 36FF Rental
- Installation of 1 – No. 30” diameter pipeline installation pile
- Water depth: 30m
|
| Pemex KuMaZa Project |
- Aker Marine Contractors
- 84FF Rental
- Installation of 12 – No. 84” diameter mooring piles
- Water depth: 98m
|
| Åsgard Project |
- Technip Offshore Norway AS
- 36FF Rental
- 2 – No. 36” diameter pipeline initiation piles
- Water depth: 380m
|
| Tyrihans Project |
- Acergy Offshore Norge AS
- 72” Slotted Frame Rental
- 60” Pile Upending Tool Rental
- Installation of 2 – No. 60 diameter mooring piles
- Water depth: 150m
|
|
2006
|
Britannia Project |
- Acergy UK Ltd
- Supply of offshore personnel to prepare and operate S200
piling spread
|
| Statoil Volve Project |
- Acergy Offshore Norge AS
- 84FF Rental
- 72” Pile Upeding Tool Rental
- Installation of 9 – No. 72” diameter mooring piles
- Water depth: 100m
|
| Marathon Alvheim Project |
- Technip Offshore Norge AS
- 72SF Rental
- Installation of 12 – No. 72” diameter mooring piles
- Water depth: 120m
|
| Talisman Tweedsmuir Project |
- Sonsub Ltd
- S90-S280 Hammer Upending Frame Rental
- 24” Pile Upending Tool Rental
- Supply of personnel
|
| BP Schiehallion Project |
- Technip Offshore UK Ltd
- 36FF Rental
- Installation of 2 – No. 36” diameter riser base piles
- Water depth 390m
|
|
2005
|
‘DEAPS’ Deepwater WROV Driven Piling System |
- 3 party, joint venture project. Perry Slingsby Inc. & IHC Hydrohammer
- Investigation into the feasibility of driving S90/S200 in
1,500 – 2,000m water depth by WROV using the standard
60FF
|
| MISC South Angsi Project |
- Subsea 7 (SGP) Ltd
- 60FF rental
- 60” Follower rental
- Installation of 14 – No. 60” diameter mooring piles
- Water depth: 72m
|
| Statoil Åsgard Project |
- Technip Offshore Norway AS
- 36FF rental
- 2 – No. 36” diameter pipeline initiation piles
- Water depth: 380m
|
| Statoil Sleipner – Langeled Project |
- Aker Marine Contractors AS
- 36FF rental
- Installation of 8 – No. 36” diameter trawl hook piles
|
|
2004
|
Statoil Åsgard Project |
- Technip Offshore Norway AS
- 36FF rental
- 2 – No. 36” diameter pipeline initiation piles
- Water depth: 380m
|
| Husky White Rose Project |
- Technip Offshore Canada Ltd
- 84FF rental
- Installation on 10 – No. 84” diameter mooring piles
- Water depth 180m
|
| Husky White Rose Project |
- Technip Offshore Canada Ltd
- 36FF rental
- Installation on 14 – No. 24” diameter riser base piles
- Water depth 180m
|
| Statoil Åsgard Project |
- Technip Offshore Norway AS
- 36FF rental
- 2 – No. 36” diameter pipeling initiation piles
- Water depth: 380m
|
| Shell Howe Development |
- Technip Offshore UK Ltd
- 24” Pile Upending Tool Rental
|
|
2003
|
Statoil Kristin Project |
- Stolt Offshore AS
- 36FF rental
- Installation of 12 – No. 36” diameter pipeline initiation piles
- Water depth: 350m
|
| SBM PM3 Project |
- Subsea 7 SGP Ltd
- 60FF rental
- 60” Follower rental
- Installation of 8 – No. 60” mooring piles
- Water depth: 90m
|
|
|
Penguins Subsea Field |
- Subsea 7 UK Ltd
- Rental of S90-S280 Hammer Upending Frame
- Rental of 6 – No. 24” Pile Upending Tools
|
|
2002
|
Shell Kestrel Project |
- Subsea 7 UK Ltd
- 30” Fixed Frame rental
- Installation of 9 – No. 30” diameter well head fishery
protection piles
- Water depth: 167m
|
| BG Juno Development |
- Coflexip Stena Offshore Ltd
- 30” Follower rental
- 30” Pile Upending Tools
|
| BP Mirren/Madoes |
- Stolt Offshore Ltd
- 36FF rental
- Installation of 2 – No. 30” diameter pipeline initiation piles
|
| Statoil Gulfaks A&C |
- Stolt Offshore AS
- 30” Fixed Frame rental
- Installation of 8 – No. 30” diameter wellhead protection
piles
- Water depth: 225m
|
| BP Schiehallion |
- Coflexip Stena Offshore Ltd
- 36FF rental
- Installation of 2 – No. 36” diameter riser base piles
- Water depth: 390m
|
| Conoco CMS |
- Stolt Offshore Ltd
- 36FF rental
- Installation of 2 – No. 30” diameter pipeline initiation piles
- Water depth: 90m
|
|
2001
|
Modec Langsa FPSO Project |
- Halliburton Far East
- 60FF Rental
- 54” Follower rental
- Installation of 8 – No. 54” diameter mooring piles
|
| Malongo Field Offshore |
- SBM
- 36FF rental
- Installation of 1 – No. PLEM and 6 – No. 36” diameter anchor piles
- Water depth: 25m
|
| Kursk Submarine Recovery |
- Preparation of a feasibility study for the removal of the
bow section of the damaged submarine. Developed
procedures using saw wires, fast Frame and 2 – No.
anchor piles.
- Water depth: 110m
|
| Monaco Harbour Extension |
- IHC / Smit International
- Design of mooring padeyes and pile design input for
42”, 60” and 72” diameter anchor piles
|
|
2000
|
Texaco Erskine |
- EMC
- 36FF rental
- 36” Pile Upending Tool Rental
- Installation of 1 – No. 36” diameter pipeline initiation pile
- Water depth: 110m
|
| Talisman Claysmore |
- EMC
- 36FF rental
- 36” Pile Upending Tool Rental
- Installation of 1 – No. 36” diameter pipeline initiation pile
- Water depth: 110m
|
| Banff STL Moorings |
- Coflexip Stena Offshore Ltd
- 72” Finned Frame rental
- 72” Follower rental
- Installation of 8 – No. 72” diameter mooring piles
|
| Snorre B |
- EMC / Norsk Hydro
- 36FF Rental
- 36” Pile Upending Tool Rental
|
|
1999
|
Anemometer Mast, East Coast England |
- RES Ltd
- Design, construction and installation of piled anemometer
mast for the purpose of collecting environmental data
prior to the installation of wind turbines
|
|
1998
|
Bluewater Flora |
- Rockwater
- Project management, design, development, construction
and installation of 2 – No. 55t ballasted suction riser base
piles
|
| IBC Moorings and Achoring Conference |
- Sea Steel presented a paper on the method of calculation
the cost comparison between suction and impact driven
piles
|
|
1997
|
SBM Aquila |
- SaiClo
- Prepared detailed technical feasibility analysis for
suction installation techniques for suction operations in
850m water depth.
|
| Chevron Alba |
- JPK
- Prepare DCMA specifications and detailed installation
procedures and design using the legs for suction
|
| BP Schiehallion |
- SBM
- Provide site representation and reporting for the installation
of 14 – No. 127 tonne suction driven mooring anchors
aboard the AHT ‘Maersk Puncher’
- Water depth: 390m water depth
|
| BP Schiehallion |
- SBM
- Provide site representation & reporting for the installation
and lay and connection of 14 – No. chain & plastic coated
mooring lines from the “Maersk Battler” AHT
- Water depth 390m
|
| BP Schiehallion |
- IHC
- Provide site representation & tech. assistance for the
installation of 12 – No. 30″ diameter riser base piles
- Water depth 390m
|
| BP Shiehallion |
- Coflexip
- Design/Cost evaluation Suction Riser Bases. Preparation
of detailed design reports for suction riser bases & impact
driven piles including fabrication drawings
|
|
1996
|
Bluewater Fergus |
- Rockwater
- Project management / design development / construction
and installation of 1 – No. Ballasted 52 T suction riser
base pile
|
|
1995
|
Norsk Hydro Troll Olje |
- Rockwater / SCS
- Project management / design development for 84″
diameter anchor piles stabbed directly into the seabed,
without using a frame
|
|
|
Bluewater Fife/Gorm |
- Rockwater / SCS
- Project management / design development of piling
equipment for 60″ diameter FPSO anchor piles stabbed
indirectly into the sea- bed using an alignment frame
|